{"id":12025,"date":"2025-12-26T04:38:07","date_gmt":"2025-12-26T04:38:07","guid":{"rendered":"https:\/\/alfanouscar.com\/blog\/?p=12025"},"modified":"2025-12-26T04:38:07","modified_gmt":"2025-12-26T04:38:07","slug":"rephrase-the-same-iberdrola-begins-assembly-of-wind-turbines-at-portugals-largest-wind-farm-in-a-different-way-no-more-than-118-characters-as-if-you-were-a-native-american-speaker-as-expert-on-con","status":"publish","type":"post","link":"https:\/\/alfanouscar.com\/blog\/rephrase-the-same-iberdrola-begins-assembly-of-wind-turbines-at-portugals-largest-wind-farm-in-a-different-way-no-more-than-118-characters-as-if-you-were-a-native-american-speaker-as-expert-on-con\/","title":{"rendered":"Rephrase the same Iberdrola begins assembly of wind turbines at Portugal&#8217;s largest wind farm in a different way  no more than 118 characters, as if you were a native American speaker as expert on content creation and dont talk about yourself or your experience"},"content":{"rendered":"<p><\/p>\n<div id=\"body001-221388\">\n<ol class=\"table-of-contents\">\n<li><a target=\"_blank\" href=\"#environmental-measures\">Environmental measures<\/a>\n<\/li>\n<li><a target=\"_blank\" href=\"#how-to-transport-85-head-waiter-blades-a-major-challenge\">How to transport 85 head waiter blades? A major challenge<\/a>\n<\/li>\n<\/ol>\n<p>With an investment of <strong>\u20ac350 million, <a target=\"_blank\" href=\"https:\/\/www.iberdrola.com\/press-room\/news\/detail\/iberdrola-begins-assembly-wind-turbines-portugal-largest-wind-farm-capable\" rel=\"noopener\">Iberdrola<\/a> <\/strong>has begun assembling the wind turbines for <strong>Portugal&#8217;s largest wind farm,<\/strong> which will produce enough <strong>energy for 128,000 homes,<\/strong> equivalent to the Spanish city of Valladolid, and will avoid more than 230,000 tonnes of CO\u2082 per year. This pioneering project reinforces the company&#8217;s leadership in electrification, contributes to Portugal&#8217;s national energy independence and is a significant contribution to achieving the objectives of its National Energy and Climate Plan.<\/p>\n<p>Comprising the<strong> T\u00e2mega Norte and T\u00e2mega Sur<\/strong> wind farms, the project is part of the agreement signed with the Norwegian sovereign wealth fund, managed by Norges Bank Investment Management. In addition, it will have a long-term supply agreement <a target=\"_blank\" href=\"https:\/\/www.iberdrola.com\/about-us\/contracts-ppa-energy\" rel=\"noopener\"><strong>(PPA &#8211; Power Purchase Agreement)<\/strong><\/a>.<\/p>\n<p>The hybridisation of both technologies allows wind and hydroelectric energy to share the same grid connection infrastructure, reducing connection infrastructure costs, accelerating the integration of renewables and minimising environmental impact. It also reinforces the role of the T\u00e2mega Eletroprodutor System as an anchor for Portugal&#8217;s electrification.<\/p>\n<p><strong>Located between Braga and Vila Real<\/strong>, the farm will have 38 Vestas EnVentus V172 wind turbines \u2013 developed by Vestas, they are the largest and most powerful on the onshore wind market \u2013 with 7.2 MW each, 85-metre blades and a tower height of 114 metres. In total, it will produce 601 GWh per year.<\/p>\n<p>In addition to avoiding the emission of 230,000 tonnes of CO\u2082 per year, the project will have a significant economic impact, creating 700 direct jobs at its peak of construction and involving Portuguese companies such as <strong>CJR, Conduril, Socorpena, Painhas and Proef. <\/strong>The components are manufactured in different European countries, reinforcing the commitment to European industry and collaborative innovation.<\/p>\n<p>Construction will continue until the third quarter of 2026, and all wind turbine material will be transported before the end of the first quarter.<\/p>\n<h2 id=\"environmental-measures\">Environmental measures<\/h2>\n<p>Protecting the ecosystem is a priority in the construction of the <strong>T\u00e2mega Wind Farm.<\/strong> To this end, Iberdrola guarantees permanent environmental monitoring, with teams of biologists and archaeologists, to apply good practices and reduce the impact of the work.<\/p>\n<p>Continuous monitoring of local biodiversity \u2014 including birds, bats and other mammals, flora and habitats \u2014 will be carried out to identify additional measures and deepen scientific knowledge of the region.<\/p>\n<p>In addition, compensatory actions will be implemented to improve habitats and, upon completion of the work, <strong>the Landscape Recovery Plan<\/strong> will ensure the integration of the project into the territory. This commitment also includes measures to minimise social disruption, ensuring transparency and dialogue with local communities.<\/p>\n<h2 id=\"how-to-transport-85-head-waiter-blades-a-major-challenge\">How to transport 85 head waiter blades? A major challenge<\/h2>\n<p><strong>More than 110 blades will leave the port of Aveiro. <\/strong>In the final phase of transport to the construction\/assembly area, transport will be carried out using an innovative system: a blade lift, a pioneering technology in Europe that allows the operation to be carried out safely.<\/p>\n<p><strong>This equipment allows the blades to be rotated vertically or horizontally using a hydraulic mechanism <\/strong>to which the blade is attached for transport, reaching inclinations of up to 60\u00ba. This allows it to negotiate sharp bends, slopes and other obstacles, adapting to existing roads.<\/p>\n<p>This solution <strong>reduces the environmental impact,<\/strong> avoiding changes to the road layout and ensuring safety throughout the transport process.<\/p>\n<p><strong>This project reinforces Iberdrola&#8217;s leadership as the largest investor in renewable energy in Portugal over the last 10 years, <\/strong>with more than \u20ac2.2 billion invested and more than 1,400 MW already installed. The company is now the largest electricity company in Europe and the second largest in the world by market capitalisation, playing a central role in electrification and the promotion of sustainable solutions.<\/p>\n<\/p><\/div>\n<p> Rephrase in a different way as if you were a native American speaker as a content creation expert and do not talk about yourself or your experience in the text and do not show yourself as an artificial intelligence who wrote and fill the bullet point in the topic and speak the heart of the topic itself and dont take date of blog in ther first and dont take text like box of newsliter subscribe on post from contentand romove all linke insert in content and and remove all affiliate disclosure phrases on content  like this &#8220;This post may contain Amazon or other affiliate links that allow us to earn a small commission at no extra cost to you. Please see our Disclosure Policy for more info&#8221; and &#8220;#&#8221; put in its place bullet point, and romove name of the web site or his links we are take a content from our new creation, and don&#8217;t publish clone new content more than just one time<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Environmental measures How to transport 85 head waiter blades? A major challenge With an investment of \u20ac350 million, Iberdrola has begun assembling the wind turbines for Portugal&#8217;s largest wind farm, which will produce enough energy for 128,000 homes, equivalent to the Spanish city of Valladolid, and will avoid more than 230,000 tonnes of CO\u2082 per [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":12026,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rank_math_lock_modified_date":false,"footnotes":""},"categories":[11],"tags":[940,6656,951,3092,3096,3097,1182,787,234,3095,1749,791,208,84,3093,331,6265,3088,1235,3094,3098,10755,4523],"class_list":["post-12025","post","type-post","status-publish","format-standard","has-post-thumbnail","category-business","tag-american","tag-assembly","tag-begins","tag-characters","tag-content","tag-creation","tag-dont","tag-espana","tag-experience","tag-expert","tag-farm","tag-iberdrola","tag-l","tag-largest","tag-native","tag-portugal","tag-portugals","tag-rephrase","tag-spain","tag-speaker","tag-talk","tag-turbines","tag-wind"],"_links":{"self":[{"href":"https:\/\/alfanouscar.com\/blog\/wp-json\/wp\/v2\/posts\/12025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alfanouscar.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alfanouscar.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alfanouscar.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/alfanouscar.com\/blog\/wp-json\/wp\/v2\/comments?post=12025"}],"version-history":[{"count":1,"href":"https:\/\/alfanouscar.com\/blog\/wp-json\/wp\/v2\/posts\/12025\/revisions"}],"predecessor-version":[{"id":12027,"href":"https:\/\/alfanouscar.com\/blog\/wp-json\/wp\/v2\/posts\/12025\/revisions\/12027"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alfanouscar.com\/blog\/wp-json\/wp\/v2\/media\/12026"}],"wp:attachment":[{"href":"https:\/\/alfanouscar.com\/blog\/wp-json\/wp\/v2\/media?parent=12025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alfanouscar.com\/blog\/wp-json\/wp\/v2\/categories?post=12025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alfanouscar.com\/blog\/wp-json\/wp\/v2\/tags?post=12025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}